Type: Commercial Project
Description: The bookstore building offers 9,200 m2 of office space in a ten floor tower in downtown Jeddah., with Jarir Bookstore retail shops.
The crystalline waterproofing admixture was treated with Approximately 4,350 m3 of concrete to ensure increased durability of the concrete raft foundation and the concrete water storage tanks.
Type: Hotel Project
Description: With its location in Faces Red Sea, the GC Hotel is A 5-star hotel that will comprise 12 floors. Crystalline admixture was added to 15,350 m3 of concrete used to waterproof the concrete basement structure and water storage tanks.
Type: Commercial Project
Description: Al-Yosofi Commercial Building Contains 6 floors of office space with 2 Basements in Jeddah, Albaladyah Street. The ground floor has four retail shops; parking is available on two underground levels. The crystalline admixture was added to 2,800 m3 of concrete used in the basement floors, the water storage tanks, and the raft foundation.
Type: Commercial Project
Description:Located on the Red Sea coast in the main urban center of Saudi Arabia’s 2nd largest city, the Abdullah Ali Reda Mall, with 120 retail shops, is a major regional hub for shopping.
Approximately 10,350 m3 of concrete were treated with Crystalline admixture to ensure increased durability of the concrete raft foundation and the concrete water storage tanks that supply the mall.
Type: Factory Project
Description:The Al-Khayat Ceramic
Factory was recently expanded to include
a landscaped setting, outdoor parking, and a new entrance for the 45,000 m2 facility. Approximately 3,750 m3 of con- crete used in the concrete raft foundation and water storage tanks were treated with crystalline admixture.