Type: Government Project
Description: The 767 septic tanks concrete was treated with crystalline admixture with 6,000 m3 of concrete per phase for 7 tanks.
Type: Hotel Project
Description:With its location in proximity to Jeddah Airport, the Hilton Garden Inn is anticipated to host primarily business travel- lers.The 213 Guest Rooms and Suites as well as public areas are designed in alignment to latest operator standards and Hilton Garden Inn Brand Guidelines. Crystalline admixture was added to 10,500 m3 of concrete used to waterproof the concrete basement structure and water storage tanks.
Type: Commercial Project
Description: The DAN commercial center on king Abdulaziz road in downtown Jeddah offers 2,600m2 of confronted with a high water tape due to its proximity to the red sea. Crystalline admixture used to treat approximately 6,000 m3 of concrete used in basements structure and water tanks.
Type: Hotel Project
Description: With its location in proximity to Jeddah Airport, the Millennium Hotel is anticipated to host primarily business travelers.
Crystalline admixture was added to 9,350 m3 of concrete used to waterproof the concrete basement structure and water storage tanks.